The best gravel for a shed base
4 to 6 inches of crushed stone, 1 ft wider than the shed on every side.
That number is too big. Check what you typed.
Sizes and depth must be greater than zero.
The price cannot be negative.
Extra must be between 0 and 100%.
The short answer
Use crushed stone, never round gravel. Two choices work: clean #57 stone (3/16 to 1 in), which drains best, or crusher run, which packs flatter and firmer.
Lay 4 inches on firm ground, 6 inches on soft or wet ground. Make the pad 1 ft wider than the shed on every side, so rain from the roof falls on stone, not mud.
#57 or crusher run
#57 stone lets water drain away from the floor and never turns to mud. It is a little harder to level: tamp it well, and a thin top layer of #8 or stone dust makes it easier to screed.
Crusher run has stone dust that fills the gaps. It compacts into a flat, hard pad, but drains more slowly. On clay soil, prefer #57. See the gravel sizes chart.
How to build the pad
- Mark the pad: the shed size plus 1 ft on each side. A 10 × 12 shed gets a 12 × 14 ft pad.
- Strip the sod and topsoil, then level and tamp the ground.
- Build a frame of pressure-treated 4 × 4 or 4 × 6 timbers, level and square.
- Lay landscape fabric to stop weeds and keep the stone out of the soil.
- Fill with stone in 2 in layers, compacting each one with a plate compactor, up to the top of the frame.
How much gravel for a shed base
A 10 × 12 shed needs a 12 × 14 ft pad, 168 sq ft. At 4 in it takes 56 cubic feet, 2.07 cubic yards, or about 2.8 tons of loose crushed stone. Compacting shrinks it: order about 3.1 tons of #57 (10% more) or 3.4 to 3.5 tons of crusher run (20 to 25% more). At 6 in: 3.11 cubic yards, about 4.2 tons before the extra.
The calculator above is set to that 12 × 14 ft pad, before the extra. Enter your pad size, not the shed size: the shed plus 1 ft on every side.
| Shed | Pad | Tons at 4 in | Tons at 6 in |
|---|---|---|---|
| 8 × 10 ft | 10 × 12 ft | 2.0 | 3.0 |
| 10 × 12 ft | 12 × 14 ft | 2.8 | 4.2 |
| 12 × 16 ft | 14 × 18 ft | 4.2 | 6.3 |
| 12 × 20 ft | 14 × 22 ft | 5.1 | 7.7 |
Gravel or concrete
A gravel pad suits most wood and resin sheds: it costs less, drains, and needs no curing. A garage, a workshop with heavy machines or a shed on a slope is better on a concrete slab: see how much concrete a slab takes, by size and gravel under a concrete slab.
Sources
Stone sizes: ASTM D448. Depth and pad size: common practice in shed makers' site preparation guides. Weight: about 100 lb per cubic foot of loose crushed stone.
FAQ
How deep should gravel be for a shed base?
4 inches on firm ground, 6 inches on soft or wet ground, compacted.
How much gravel do I need for a 10x12 shed?
About 2.8 tons of crushed stone for a 12 × 14 ft pad at 4 inches: order about 3.1 tons of #57 or 3.4 to 3.5 tons of crusher run, for compaction.
Can I put a shed on pea gravel?
It is not a good base: round stones shift under the floor. Use crushed stone.
Related calculators
More guides
Add this calculator to your site
Free for any website. Paste this code into an HTML block where the calculator should appear.