That number is too big. Check what you typed.
The eave length must be greater than 0 and at most 2,000 ft.
The overhang must be from 2 to 48 in.
Waste must be from 0% to 50%.
Soffit panels (12 ft)
J or F channel (12 ft pieces)
Fascia (12 ft pieces)
Soffit area
Cut pieces