Concrete Calculator by Square Footage
Enter the area and thickness. You get the concrete.
That number is too big. Check what you typed.
The area and thickness must be greater than zero.
Waste must be between 0 and 100%.
The price cannot be negative.
From square feet to cubic yards
Multiply the area by the thickness in feet, then divide by 27. At 4 in thick, one cubic yard covers 81 sq ft; at 5 in, 65 sq ft; at 6 in, 54 sq ft.
A 600 sq ft driveway at 5 in takes 250 cubic feet, or 9.26 cubic yards, and 10.19 with 10% extra. At 6 in, it takes 11.1 cubic yards before extra.
Square feet covered per yard
One cubic yard covers 162 sq ft at 2 in, 108 sq ft at 3 in, 81 sq ft at 4 in, 65 sq ft at 5 in, 54 sq ft at 6 in and 40.5 sq ft at 8 in. Divide your area by the figure for your thickness to get the yards before extra.
Before you order
Measure the forms, not the plan: a slab that runs half an inch deeper over 600 sq ft needs almost another cubic yard. Most plants sell in quarter or half yards and charge a short-load fee under 3 to 5 yards.
For a slab you measure by length and width, the concrete calculator does the same math; the concrete bag calculator gives the bags in one size, with their weight and cost. Installed prices per square foot: concrete slab cost.
US measurements
The area goes in square feet and the thickness in inches; the answer is in cubic yards, the unit ready-mix plants sell. One cubic yard covers 81 sq ft at 4 in, 65 sq ft at 5 in and 54 sq ft at 6 in. You can type a thickness as 4 1/2 or 4.5.
Common mistakes
Using the area of the room, not of the pour: a garage slab often includes an apron or thickened edges.
Dividing by 9 instead of 27: 9 turns square feet into square yards, not cubic feet into cubic yards.
Skipping the extra: order 5 to 10% more, and round up to the quarter or half yard the plant sells.
FAQ
How many square feet does a yard of concrete cover?
81 sq ft at 4 in thick, 65 at 5 in and 54 at 6 in.
How much concrete for 1,000 square feet?
At 4 in, 12.3 cubic yards, or about 13.6 with 10% extra.
How much does concrete cost per square foot?
The concrete alone, at 4 in and $150 a yard, is about $1.85 per sq ft. Placed and finished by a contractor, slabs often run $6 to $12 per sq ft.
Guides
Related tools
Add this tool to your site
Free for any website. Paste this code into an HTML block where the tool should appear.