Concrete Footing Calculator
Enter the footing length, then its width and concrete thickness in inches, not the trench depth.
That number is too big. Check what you typed.
Length, width and thickness must be greater than zero.
Waste must be between 0 and 100%.
The price cannot be negative.
How to calculate concrete for a footing
A continuous footing is a long, narrow block of concrete: length × width × thickness. Footings are drawn in inches, so divide the width and thickness by 12 before multiplying.
40 ft of footing, 16 in wide and 8 in thick: 40 × 1.333 × 0.667 = 35.6 cubic feet, or 1.32 cubic yards. With 10% extra for uneven trench walls, order 1.45 cubic yards, or 66 bags of 80 lb.
Add up every run: the four sides of a shed or garage, plus any interior bearing lines. Measure along the center of the footing; outside dimensions count each corner twice, which slightly overstates the concrete.
Common footing sizes
A common starting point is a footing twice as wide as the wall and at least as deep as the wall is thick: 16 × 8 in under an 8 in block wall, 20 × 10 in under a 10 in wall. Soil, loads and local code set the final size, and the bottom must sit below the frost line.
Trenches dug straight into firm soil often run wider than planned: measure the real trench before ordering. Keep rebar 3 in off the soil with chairs or bricks.
US measurements
The length goes in feet, the width and thickness in inches, as footings are drawn on US plans. Concrete is ordered by the cubic yard; small footings use 80 lb bags, about 0.60 cu ft each. For 10 ft 6 in, type 10.5 or pick ft + in beside the box.
Common mistakes
Typing the trench depth as the thickness: a footing 8 to 12 in thick often sits 24 to 36 in down, below the frost line. Only the concrete counts.
Counting corners twice: measure along the center line of the footing, or count each corner only once.
Ignoring uneven trench walls: dug trenches are rarely square. Add 10% or more for a trench poured without forms.
FAQ
How deep should a footing be?
Its bottom must sit below the frost line, from about 12 in in the South to 48 in or more in the North. That depth is the trench; the concrete itself is often only 8 to 12 in thick.
How wide should a footing be?
About twice the wall width: 16 in for an 8 in block wall is common. Your local code and soil decide.
How much concrete for a 20x20 garage footing?
With 8 in walls measuring 20 ft outside, the footing runs on the wall center line, about 77.3 ft: at 16 × 8 in, 68.7 cubic feet, or 2.55 cubic yards, and 2.8 with 10% extra.
Guides
Related tools
Add this calculator to your site
Free for any website. Paste this code into an HTML block where the calculator should appear.